Maps · data · reports on the territory

The territory,
tile by tile.

We turn public satellite, climate and power grid data into answers: where to connect, which assets are exposed and what can fail. Using physical models, statistics and machine learning, at the scale of your project and with the reliability of every figure.

Why TESELA

Anyone can plot public data. What we do is turn it into intelligence: answers you can check.

Models, not just maps

We combine sources, downscale them with physics and machine learning and validate the result against what actually happened: faults, wildfires, measurements.

At the scale of the decision

From 9-30 km cells down to whatever the data allows, and from there to what you decide on: an asset, a plot, a grid node or a municipality.

With a confidence score

Every figure carries a score from 0 to 10 and what it has been checked against. If the score is low, we tell you which data would improve it.

Public data first

We start from public data: it belongs to everyone and anyone can check what we say.

Copernicus satellites and services, the CNMC, REE, MITECO, the land registry, OpenStreetMap. Every source is cited with its date, and on top of that comes our work: cleaning, combining, modelling and validating.

When a study calls for it, the client can provide their own data: measurements, fault history, asset inventory. It is used only for their study, never mixed with anything else and never leaves it.

We start with Spain, but almost all the sources are European. The same work can be done in any EU country.

Downscaling

Coarse

From the model to your plot.

This is how a global reanalysis sees your area: a few cells per province.

Illustration using a TESELA map · the final resolution is whatever the data allows

Anatomy of a TESELA figure

Question
Is a transmission line more likely to fail in the year fire burns along its route?
Result
28 % of lines had a fault, versus 12 % when the route does not burn. The probability almost doubles (×1.9).
Data
REE quality-of-service audits 2021-2025 (3,285 line-years), EFFIS wildfires, OpenStreetMap routes.
Procedure
A line-by-line model that separates fire from line length and voltage; the risk model was frozen in 2020 and tested against what happened afterwards.
Margin
p = 0,001: casi imposible que sea casualidad.
Score
8/10
Why it is not a 10
Five years is short for rare events, and OpenStreetMap is not REE's inventory.
What would raise it
The utility's own line inventory and more years of fault records.

Method

Every figure has its score.

This is our guarantee standard. Every result is delivered with the procedure that produces it, the data it comes from, its margin and a score from 0 to 10 that tells you how far you can trust it. If the score is low, we tell you what would raise it. We would rather give you an honest figure than a spectacular one.

  • From result to data, with no gaps. Each report describes its method step by step, so you can trace any figure back to the data behind it.
  • Every piece of data, with its origin. A public source cited with its date, or your own data if you have provided it. We always say which is which.
  • Caveats, in writing. If we are not fully convinced by a piece of data, we say so, with its score and the reason why.
  • And how to improve it. Which data or what work would raise the score, so you can decide whether it is worth it.

No black box, no half-truths: data, a result with its reliability and a proposal to improve it.

8 /10

Fire and faults. Checked against 3,285 line-years of REE data.

6 /10

2041-2070 projection. Five climate models; depends on the scenario.

6 /10

Wind. With annual data it does not show up in the faults; that does not mean it does not matter.

DownloadEvery source, with its date.
ScaleAs far as the data allows.
OverlayIndicators per asset or plot.
ValidationAgainst what actually happened.
DeliveryReport, GIS and web.

Recent maps

This is TESELA.

Maps made with public data, dated and sourced. Each one answers a question and can be redone for your area. Click to see it in full.

Power grid · CNMC, 02-11-2026

The grid, node by node

Only 45 of the 937 transmission nodes have room for renewables: 1,413 MW. Reliability 9/10.

Risk · EFFIS, Copernicus · 2026

Where it burns and where summer dries out

Wildfire recurrence and summer dryness, cell by cell.

Rail · timetables for 10-11-2026, OpenStreetMap

Trains and protection, section by section

Trains per day and protection system (ASFA, ERTMS, LZB) for each section.

Grid and land · Nov 2026

Garoña node sheet

Suitable land within 25 km, free of protected areas, burnt or flood-prone zones.

News

What is changing around you.

Rules, data releases and decisions that affect the grid, land and risk. Each item comes with its source, date and score.

Delivery formats

This is what you get.

Four formats depending on what you need: a one-off report, a sheet per site, a tailored study or monthly monitoring. Open each one to see what you would receive.

01 · Physical risk

Physical risk of assets

Which assets are most at risk, and why?

Wildfire, flood and heat for every plant, line or substation, today and in 2041-2070; for grids, checked against real faults.

  • Insurers
  • Funds and banks
  • Distribution companies
02 · Grid and land

Power grid and land

Can you connect here, and on what land?

Access capacity at each node, free and unrestricted land around it, and what it costs to get there. With an alert when something changes.

  • Developers
  • Batteries
  • Data centres
03 · Tailored

Tailored studies

Your question, with whatever data it takes.

We combine whatever public sources are needed, and yours if you want to provide them, bring them down to the scale the data allows and calculate the indicator you need.

  • Consultancies
  • Public administrations
  • Agriculture and water
04 · Monitoring

Monitoring

What has changed in your area this month?

Your layers kept up to date: a dated refresh of each source and an alert when something that affects you changes. No need to commission the study again.

  • Asset portfolios
  • Development teams
Transmission grid maps with the annual probability of fire along each line's route, today and in 2041-2070.

Sample report · physical risk

Risk report for a grid or portfolio

Answers: which assets are most at risk, from which hazard, and how much will it change?

  • Risk per asset or per 1 km section: wildfire, flood and heat; extreme wind and hail in preparation.
  • Test against your failure history: which hazard explains them and which does not.
  • 2041-2070 projection with several climate models.
  • Assets ranked by risk, to guide investment and maintenance decisions.
  • A score from 0 to 10 on every figure, and which data would raise it.
8-20 page PDFGIS layers per assetAnnual update

Published example: risk for Spain's transmission grid (November 2026), 683 lines checked against REE fault records for 2021-2025.

Download the report (PDF, in Spanish)
Node sheet: suitable land, existing plants, burnt and flood-prone areas and power lines around a substation.

Sample report · grid and land

Node sheet

Answers: is there room on the grid, and land, for me to connect here?

  • Access capacity at the node and how it has changed, according to the CNMC.
  • Suitable land within 25 km: free of protected areas, burnt or flood-prone zones.
  • Existing plants and plants in permitting nearby.
  • Distance and indicative cost of the connection line to the node.
  • Context of the tender or access procedure, if there is one.
3-page PDFGIS layersOptional monthly alert

Published example: sheets for the just transition nodes (Garoña, Velilla and Guardo, Compostilla, Montearenas, Litoral). At Compostilla, 192 ha of unrestricted land 3.2 km from the node.

Download a sheet (PDF, in Spanish)

Sample report · tailored

Tailored study

Answers: your project's question, in your area and at your scale.

  • Which public data is useful, from when and at what resolution.
  • Downscaling as far as the data allows (often 40-250 m), using terrain, land use and machine learning.
  • Validation against observations (weather stations, faults, wildfires), with its error.
  • The indicator you need, per point, plot or municipality.
  • Alternatives: what we would gain with more data, public or yours (your measurements, one more year of records, another source).
PDF reportGIS layers and time seriesScope agreed with you

Published example: a provincial sample on wildfire near the power lines of Cantabria, with its method and its limits.

Download the sample (PDF, in Spanish)

Sample report · monitoring

Monitoring bulletin

Answers: what has changed this month that affects you?

  • Capacity changes at the nodes you are interested in.
  • New plants or plants in permitting near your sites.
  • Refreshed sources, each with its date.
  • Alerts when an indicator crosses the threshold you set.
Monthly emailUpdated layersInstant alerts

No bulletin published yet: we will prepare a sample one for your area.

Case study · Spain's transmission grid

What really explains grid faults?

The question every grid operator asks in the face of climate change: which threat really brings lines down, and how much worse will it get? We answered it with public data, line by line, for all 683 lines at 220 and 400 kV.

Annual probability of fire along each line's routeWith today's climate and in 2041-2070 (RCP8.5, median of five models)

Sources: REE (lines and faults), Copernicus, EFFIS, OpenStreetMap · TESELA, November 2026

1 · What we measure

28 % versus 12%

of lines had a fault in a year when fire burned inside their route. The probability almost doubles (×1.9).

Score 8/10

2 · What we cannot see

Wind and rain

Measured year by year, they do not explain the faults. Their failures are local and last hours; a 25 km grid cannot capture them.

Score 6/10

3 · What is coming

+35 % a +74 %

more fire-related faults in 2041-2070, depending on the scenario. 10% of the lines hold half the risk: that is where investment pays off.

Score 6/10

See the full report (PDF, in Spanish)

Behind TESELA

Abel Tortosa-Andreu

Scientist and engineer. Twenty years designing his own methods to predict what the atmosphere will do and turn it into energy decisions.

An astrophysicist by training, with doctoral research in solar physics at the Instituto de Astrofísica de Canarias. Since then he has built operational forecasting systems, invented algorithms that have made their way into industry and brought high-performance numerical computing to real energy problems. His hallmark: understanding the problem before touching the data and, when the method needed does not exist, creating it.

High-performance numerical computing

Magnetohydrodynamic simulation of the Sun on MareNostrum, parallel code with MPI and GPU computing with CUDA from its early days: accelerated finite volume and finite element methods for engineering.

Forecasting systems

Operational numerical weather prediction, wind and solar forecasting for Europe, Asia and Latin America, a wind-ramp forecasting system presented at the EGU, and electricity demand forecasting with model ensembles.

Proprietary algorithms

Re-Modeling, a long-term extrapolation method for wind time series later sold to Vestas, and its 4D extension; self-learned power curves and machine-learning gap-filling models.

From problem to solution

He has led forecasting teams and worked on both sides of the table: with those who commission a study and make decisions with it, and with those who code it. That is why he designs every answer around the decision behind it.

  1. Solar physics and supercomputingInstituto de Astrofísica de Canarias

    Radiative magnetohydrodynamic simulation of the Sun on MareNostrum (BSC), with publications in Astronomy & Astrophysics.

  2. High-performance computing on GPUsCIMNE

    GPU-accelerated finite volume and finite element algorithms for engineering simulation.

  3. Numerical prediction and forecastingMeteosim Truewind · AWS Truepower · UL

    From operational model developer to head of forecasting and director of information services for Europe, the Middle East and Africa.

  4. Director of ForecastingVortex

    R&D in atmospheric modelling, geostatistics and data science. Created Re-Modeling and a predictive system for wind farms.

  5. Wind fleet data and performanceHolaluz · GE Vernova

    Demand forecasting and, at GE Vernova, predictive analytics with SCADA, fleet indicators and cloud-based machine learning.

  6. Wind resource, on the developer sideA renewable energy developer

    Senior wind resource engineer and developer: long-term extrapolation, data gap-filling and wind farm design.

  7. Energy R&D and TESELAMadrid

    All of the above, together: physics, data at scale, validated models and maps you understand at first glance.

HPC · MPI · CUDAPython · C/C++ · FortranWRF · ARPS · numerical weather predictionMachine learningGeostatistics · GIS · remote sensingAWSES · CA · FR · ENMadrid

Contact

What decision do you need to make?

Tell us about the project and the area. We will reply with a proposal and, if it fits, a sample map with your data.

[email protected] →

To start, tell us

  1. The questionWhat you need to decide, and by when.
  2. The placeA point, a plot, a network or a portfolio of assets.
  3. Your dataIf you have them: measurements, failure history, inventory. They are optional and used only for your study.

We reply in Spanish, Catalan, French or English.